Houses of Parliament, Westminster, London.
As part of a team of fire consultants currently (September 2005) reviewing the fire safety engineering strategy of the Palace of Westminster, I contributed the parts of the qualitative design review (QDR) dealing with: the establishment of fire safety objectives; history of fires in similar buildings; and important fire and smoke spread scenarios. ...