London Underground Ltd escalator/travelator chambers, London
Following the Kings Cross fire disaster and the replacement of much combustible content, LUL wished to have an independent opinion on the appropriateness of its fire suppression system installed under escaltors. After making a survey of several stations I made calculations of fire load and made recommendations for revised sprinkler coverage for modern installations.
Client: Kingfell Fire Protection Ltd, London
Underground Station Lift Replacement, London
Assessment of possible structural failure of lift support structure and fire hazards (Bank, Tufnell Park and Chalk Farm Stations).
Client: London Transport
Birmingham International Airport Terminal building.
Assessment of use of unprotected steelwork based on a fire safety engineering study made by British Steel Corporation.
Client: DOE Building Regulations Division, 1981.
Road tunnels.
Assessment of amount of fire resistance needed.
Client: Tunnels Engineering Branch of Department of Transport, London, 1980
Broadwater Bridge, Worthing.
Assessment of fire damage to prestressed concrete T-beams, proposals for tests, and recommendations.
Client: West Sussex Engineering Consultancy, 1997
Share